Local News

A Lithium Drill Program Has Been Completed Near Snow Lake.

Foremost Lithium Resource and Technology reports they have successfully completed a 24 hole three thousand meter drill program on its Jean Lake Lithium Project near Snow Lake.  The Company collected a total of 246 drill core samples and ten outcrop chip samples during the program and all samples have been shipped to Activation Laboratories in Ancaster Ontario for Lithium and gold assays with results expected to be released in the second quarter.

 

              Characteristics of spodumene mineralization in the B-1 B-2 pegmatite are observed to vary along strike with respect to the color and size of spodumene crystals.  The dyke appears to pinch and swell along its irregular strike.  The B-1 portion of the pegmatite was drilled between 6 and 61 meters with intervals of point five percent to twenty percent spodumene between 9.8 and 25 meters.  There was an appearance of gold mineralization with visible gold in the core.

Frontline Sport & Leisure - U-Pick/Opinion Poll

Frontline Sport & Leisure U-Pick Song of the Day -Songs About Friendship

Your Calendar

March

S M T W T F S
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31            

Weather