Infinite Menus, Copyright 2006, OpenCube Inc. All Rights Reserved.
Local News


Rockcliff Metals Corporation has completed the first phase ten hole step out drill program totaling 3250 meters on the Company’s Bur Zinc Property in the Snow Lake Mining Camp.  The drilling showed 7.2 percent zinc equivalent across 4.9 meters including 10.9 percent across 2.9 meters.


Rockcliff President Ken Lapierre says the program was successful in identifying significant VMS mineralization adjacent to and southwest of the known limits of the historical Bur zinc deposit.  He adds each drill hole intersected what is termed the Bur VMS horizon which is a potential 8 thousand meters long mineralized horizon that hosts the original Bur zinc deposit adding the potential to identify additional resources along this important horizon is considered excellent and will be the focus of upcoming drill programs on the property.

Hide Comments

Quick Pick






Frontline Sport & Leisure - U-Pick/Opinion Poll
It's Frontline Sport and Leisure's U-Pick Of The Day- Hitting The Highway
Sheryl Crow- Every Day Is A Winding Road
BTO- Let It Ride
Stampeders- Hit The Road Jack
View Results

Your Calendar

LinkedUpRadio Envisionwise Web Services