banner banner banner banner banner
Infinite Menus, Copyright 2006, OpenCube Inc. All Rights Reserved.
Local News



Satori Resources has issued a new resource estimate for the Tartan Lake Gold Mine Project 12 kilometers northeast of Flin Flon


Their President Will Ansley comments the new mineral resource estimate focused on a higher cut off grade concept reflecting the high grade nature of the deposit, upgraded the resource models, geostatistical analysis and specific gravity assumption utilized in the previous report.  He says the result is a significant increase in both the overall confidence level to indicated from inferred and gold grade to 6.32 grams per tonne from 5.12 grams per tonne which is consistent with what was previously milled in 1988-89 at Tartan Lake   Ansley adds at a conceptual mill rate of 450 tonnes per day their resource tonnage could potentially support several years of mill feed which is a tremendous head start for the Company as they continue to explore the property.


Hide Comments

Quick Pick






Frontline Sport & Leisure - U-Pick/Opinion Poll
It's Frontline Sport and Leisure's U-Pick Of The Day- Hitting The Highway
Trooper- Boys In The Bright White Sports Car
War- Low Rider
Beach Boys - I Get Around
View Results

Your Calendar

LinkedUpRadio Envisionwise Web Services